Wika BWX Manual do Utilizador Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 7
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 6
INSTRUCTION MANUAL
NI-222E
Rev. 1 12/02
ETTORE CELLA SPA Viale de Gasperi, 48 - Casella Postale (P.O. Box) 96 - I 20010 Bareggio (MILANO) ITALY
Telefoni +39 029036.1146/7 - 029036.1237/41 - FAX +39 029036.1331 Email: [email protected]
WEATHERPROOF EXPLOSIONPROOF
Fig. 7 - Example of connections - Fig. 8 - Example of connections -
Fig. 9 - Example of mounting -
NOTE With gas or vapour
process fluid, the instrument
must be positioned higher than
the pipe inlet (see Fig. 8). With
a liquid process fluid, the in-
strument can be positioned
higher or lower, indifferently
(see Fig. 7 and 8). In this case,
during set point calibration the
negative or positive head
must be taken into account.
(Distance h in Fig.7 and 8).
LEGEND
1 - Fitting
2 - Drain plug
3 - Service valve
4 - Piping
5 - Three piece fitting
6 - Root valve with drain
7 - Process piping
8 - Three piece fitting
9 - “T” fitting
10 - Three piece fitting
11- Curve
12 - Blocking joint
13 - M6 screws (No. 4)
14 - Bracket for 2” pipe
15 - Vertical pipe
16 - Horizontal pipe
Montaggio a parete
Montaggio su staffa per tubo 2" (palina verticale)
Montaggio su staffa per tubo 2" (palina orizzontale)
Surface mounting
2” pipe mounting (vertical pipe)
2” pipe mounting (horizontal pipe)
Vista de página 6
1 2 3 4 5 6 7

Comentários a estes Manuais

Sem comentários