Wika D-21-9 Manual do Utilizador Página 41

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 51
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 40
D-20-9 / D-21-9 GB
WIKA Additional Instructions Pressure Transmitter with CANopen Interface D-20-9 / D-21-9 41
Enter Pre-Operational
Through this service the NMT Master sets the state of the selected NMT Slaves to "PREOPERATIONAL".
This service is unconfirmed.
CS = 80h
Reset Node
Through this service the NMT Master initiates a "RESET APPLICATION" of the selected NMT Slaves from
any state. This service is unconfirmed.
CS = 81h
Reset Communication
Through this service the parameters of the communication profile area are set to their power-on values. After
this the state "INITIALISATION" is finished and the device executes the write boot-up object service and
enters the state PRE-OPERATIONAL.
CS = 82h
Vista de página 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 50 51

Comentários a estes Manuais

Sem comentários